MS Construction and Services logoMS Construction and Services Call Now
Home / Guides

What it costs to sand and stain a deck

Our own rates, the same ones our calculator uses, with what is included and what is charged on top. Bay Area, 2026.

Our own rates, not a national averageLabor only — materials are listed separatelySame numbers our calculator uses

Short answer

  1. Sanding and staining together: $7.00 + $3.50 per sq ft of labor on a 300–500 sq ft deck.
  2. Above 500 sq ft the rates drop to $6.50 + $3.00.
  3. Staining alone, with no sanding: $3.50 per sq ft, $3.00 above 500.
  4. Below 300 sq ft we decline the job rather than price it.

These are labor rates. Stain, washing and protection are charged on top, and a typical 400 sq ft deck lands between $3,150 and $5,250 in labor.

The rates, and what sits behind each one

These are the figures our calculator uses. Put your own square footage into it and you will see the same numbers — there is one source and this page is reading from it.

Sanding and staining, 300–500 sq ft
$3,150 – $5,250$7.00 + $3.50 per sq ft
The usual job: the grey weathered surface is taken back to bare wood, then stained. Both figures are labor.
Sanding and staining, 500 sq ft and up
from $4,750$6.50 + $3.00 per sq ft
The rate drops on larger decks because setup, masking and drying time are spread over more surface.
Staining only, 300–500 sq ft
$1,050 – $1,750$3.50 per sq ft
For a deck that is still sound and was sanded recently. If the finish is peeling rather than faded, sanding is not optional.
Staining only, 500 sq ft and up
by square foot$3.00 per sq ft
Same work, larger deck, lower rate.
Under 300 sq ft
we decline
The trip, the masking and the drying time cost the same as on a full deck. We would rather say so than quote a number nobody is happy with.

What the labor rate covers

When refinishing is the wrong answer

Questions people actually ask

How much does it cost to refinish a deck in the Bay Area?

Sanding and staining together run $7.00 and $3.50 per square foot of labor on a 300–500 sq ft deck, which is $3,150 to $5,250 for a typical deck. Above 500 sq ft the rates drop to $6.50 and $3.00. Stain, washing and protection are charged on top of the labor.

How often does a deck need staining?

Two to four years in this climate, depending on how much sun and rain the deck takes. A deck that faces west and gets no shade needs it sooner than one under trees. The honest test is water: if it soaks in rather than beading, the finish is done.

Is sanding always necessary, or can you stain over the old finish?

If the old finish is faded but intact, staining over it works. If it is peeling, cracking or blotchy, staining over it locks the damage in and the new coat fails within a season. Sanding is what makes the difference between a job that lasts three years and one that lasts three months.

Why is there a 300 square foot minimum?

Because the cost of a refinishing job is mostly setup: getting there, masking what must not be stained, and waiting between coats. Those hours are the same on a 150 sq ft deck as on a 400 sq ft one, so a small job would have to be priced at a rate that looks unreasonable. We say no instead.

Does refinishing work on composite decking?

No, and it should not be needed. Composite is not stained; it is cleaned. If a composite deck looks tired, the fix is washing and sometimes replacing boards, not a finish.

Want the number for your own deck?

The calculator takes the square footage and gives you the same range this page quotes. If the deck needs more than a finish, we will say so before quoting.